
85% of our clients have given us another project
Britannia, Hindustan Unilever and Dabur are among our clients. JMK Research ranks us among the top 10 industrial rooftop solar developers in India (FY 2025-26).
Integrated energy solutions for Indian manufacturers, combining engineering, financing, technology, execution and lifecycle asset performance.
How we work
Adhvanik combines engineering, financing, project execution, digital technology and long-term asset management through a single accountable operating model.
A free feasibility study in 7 days: an ROI sheet, a policy check for your state, roof feasibility and a budgetary quote.
Design for your roof or land and your daytime load, with the structure designed for the wind speed under IS 875.
CAPEX, PPA, lease or EMI, with partners such as Tata Capital and Siemens.
Our own project and safety engineers on site, with walkways and safety lines on every roof.
Monitoring on Asset Connect and O&M with a 95% uptime guarantee and a performance-ratio guarantee.










How the savings work
A plant lowers the electricity you buy from the grid. The feasibility study measures each of these four things on your own bills.
A rooftop plant generates only in daylight, so the more of your load runs by day, the more of the plant’s output you use directly.
Solar replaces the per-unit energy charge on your bill. It does much less for the demand charge, which is set by your monthly peak. Batteries and load scheduling work on the peak.
Roof area, structure and shading decide how large the plant can be. If the roof cannot take the load you need, spare land, a parking lot or an off-site plant can.
Compare solutions by roof and siteChoosing the installation type
You can buy the plant and keep the savings (CAPEX), or sign a PPA: Adhvanik invests in and owns the plant and you pay for the electricity it generates. A lease or EMI spreads the investment.
Compare CAPEX and PPA for your factoryHow payback is worked out
A plant earns its return over many years. So our contracts say what happens after the build: a 95% uptime guarantee with a performance-ratio guarantee, and who turns up when something fails.

Britannia, Hindustan Unilever and Dabur are among our clients. JMK Research ranks us among the top 10 industrial rooftop solar developers in India (FY 2025-26).
We invest our own capital. Our PPAs run to 2040 and 2051.

We have a dedicated safety department, and it runs site-level safety inspections.

Pick by what your site has: roof type, spare land, a parking lot or a large load.

Through-fixed, or non-penetrating mounting where you want a zero-leakage roof. Designed to comply with OEM installation guidelines and protect applicable warranties.

Ballasted or anchored structures for concrete roofs, with walkways and safety lines designed in.

For factories with spare land inside the boundary wall, or roofs that cannot take more load.

A plant built elsewhere and supplied to your factory over the grid, for loads larger than your roof can serve. Grid charges and state rules apply.

For sites with a parking lot: shade for vehicles, power for the plant and readiness for EV charging.

Batteries that reduce your peak demand charge and give you firm power.
Our in-house O&M team monitors and maintains plants we built, with uptime and performance guarantees.

We take over maintenance of plants built by other EPC companies, with monitoring and a monthly report.
How a project runs

We study your electricity bills and your roof, and send back four things.
Runs on GreenAdhvanik, our tool for profiling your site and modelling tariff, IRR and feasibility.
Our engineers lay out the plant around your roof, your loads and safe access.
Runs on Adhvanik Central, our project system that brings site data, engineering and design workflows on a single platform, enabling faster, more standardised and quality-controlled project designs.

We buy the equipment, build the plant and commission it, under our own project engineers and safety engineers.
Our own O&M engineers monitor the plant, fix faults and send you a monthly report.
Powered by Asset Connect, Adhvanik’s digital asset-monitoring platform that continuously tracks plant generation, performance ratio, irradiance and system alerts, enabling faster fault detection and O&M response.
Technology
Opportunity identification and customer intelligence
Survey, engineering, design, quality checks and execution workflows
Monitoring, preventive maintenance and asset intelligence
AI-assisted quality checks validate designs against Adhvanik’s engineering and quality standards.
Your return depends on your tariff, your roof and your daytime load. The feasibility study models all three.
25%+
IRR on CAPEX projects
A Pune plant returned 50%+ IRR and paid back in under 2 years.
You pay for each unit the plant generates, at a tariff set in your contract.
₹0
upfront investment
We work with financing partners including Tata Capital, Siemens, Solfin and Creditfair.
Not sure whether to buy or sign a PPA?
We quote a lease or EMI on request.
By the numbers
From our own records. Every monthly performance report is reviewed and signed off by an Adhvanik engineer.
Uptime is an average across the plants we maintain, not a guarantee. The uptime and performance-ratio guarantees apply to plants we build and maintain under our own O&M contracts.
Projects

Metal-sheet rooftop plant, commissioned Oct 2026.
450kWpinstalled capacity

Metal-sheet rooftop plant, commissioned Jul 2026.
771kWpinstalled capacity

Metal-sheet rooftop plant, commissioned Jul 2026.
1,332kWpinstalled capacity

Metal-sheet rooftop plant, commissioned Jul 2026.
578kWpinstalled capacity
Find plants near your factory.
Browse published projects by state and industrial belt.
Our own summaries of three projects.
Read all case studiesA ground-mount plant behind the meter, sized to the site’s daytime load and insulated from changes in net-metering policy.
A PPA, so Dabur made no capital outlay. Adhesive mounting on the metal-sheet roofs and ballast on the RCC roofs.
Plants Samruddhi owns, mounted with non-penetrating structural adhesive for a zero-leakage roof.
Common questions
Our CAPEX projects return 25%+ IRR. A Pune plant returned 50%+ IRR and paid back in under 2 years. That is one plant: yours depends on your tariff, roof and daytime use, which the feasibility study models.
Under CAPEX you own the plant. Under a PPA, Adhvanik invests in and owns it, and you pay per unit generated, with nothing upfront. A lease or EMI spreads the investment over time.
Under a PPA, you pay a per-unit tariff set in your contract, below what you pay your DISCOM (the state electricity utility) today. It depends on your project, so the feasibility study ends with a budgetary quote for your site.
Our contracts carry a 95% uptime guarantee plus a performance-ratio guarantee. Lost generation is credited at ₹3.00/kWh. Average uptime across our plants is 99%, an average, not a guarantee.
We respond remotely within 1 working day. If the fault cannot be fixed remotely, an engineer attends site within 2 working days.
We are. Our own O&M team maintains the plants we build, on contracts of up to 25 years. Under a PPA we own and run the plant for the full term, so underperformance is our cost.
Yes, under an AMC (annual maintenance contract), with monitoring on Asset Connect. Many of our clients have seen generation rise by 5 to 10% after moving their O&M to us. That is an average, not a guarantee.
A structural engineer (yours, or one we refer) confirms the roof can carry the plant before the design is fixed, and structures are designed for the wind speed under IS 875, as applicable. Non-penetrating mounting is available for a zero-leakage metal-sheet roof. Our mounting is designed to comply with OEM installation guidelines and protect applicable warranties. Walkways and safety lines are mandatory in our designs.
The feasibility study takes 7 days, and building a plant typically takes 90–100 days: a typical time, not a promise, because it depends on the site.
We have worked in Indian renewable energy since 2013. We invest our own capital in PPA plants, with commitments extending to 2051, and stay responsible for the full term. JMK Research ranks us among the top 10 industrial rooftop solar developers in India (FY 2025-26).
It takes 7 days, is free and carries no commitment. You receive: financial ROI sheet based on a preliminary design; policy check for your state and connection; roof feasibility and the area available for installation; budgetary quote. Where needed, an engineer visits the site, either during the study or at a later stage.
Free feasibility study
An engineer replies within 48 hours, calls to confirm your site and asks for your last 12 months of electricity bills.
Prefer to speak with an engineer first?